Re: Tracking the 389 Main St rehab project (10-20-18 to 10-24-18)
« Reply #60 on: October 30, 2018, 03:01:40 PM »
10-20-18

Saturday morning concrete


10-21-18

Sunday perimeter shoot, including fence left open on Ward St


10-22-18

Sequence I: pick up, carry, dump from high up


10-23-18


Sparks fly.


10-24-18

Sequence II: jackhammer big pieces, dump smaller pieces


Click to enlarge.



« Last Edit: October 30, 2018, 04:27:22 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (10-25-18 to 10-29-18)
« Reply #61 on: October 30, 2018, 04:40:36 PM »
10-25-18

Piles & Pipes, dusty dump, caught between the 165 (local) and a stony grave


10-26-18

1. Dirt, metal, stone closeup

2. Looks like a busted tailpipe.

3. No idea what this is.

4,5,6. The crew and the metal grave wait for the concrete truck.

7. Dirt, metal, stone side view

8,9. ART on a construction site!

10,11. The concrete finally arrives.


10-28-18

The river, the metal, the mudhole


10-29-18

1. CAThammering more big concrete chunks

2. Ships in the night day


Click to enlarge.


Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (10-31-18 to 11-18-18)
« Reply #62 on: November 19, 2018, 02:30:10 PM »
10-31-18 and 11-1-18

1,2. Gettin' serious on the garage part of the project.


11-4-18

3-7. The Sunday walkaround: when I can shoot things that I can't shoot (or see) from home.


11-7-18

8. I see this man fairly often, riding by slowly and surveying the scene.


11-10,11,15-18

9, 10, 11. Steel girders will soon arrive to fill in all the ground openings


11-16-18

12. Our little nor'easter


11-17-18

13. Washing the mud off his boots after work before getting into someone's vehicle for the ride home


11-18-18

14-20. Another Sunday walkaround


Click to enlarge



« Last Edit: November 19, 2018, 02:31:44 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (11-20-18 to 12-10-18)
« Reply #63 on: December 13, 2018, 06:15:14 PM »
11-20-18 (2)


11-21-18 (1)

After taking a bucket of concrete from the tub, he pours it into the concrete blocks.


11-22-18 (3)


11-24-18 (1)


11-27-18 (1)


11-28-18 (1)


12-1-18 (3)

Drops off two, picks up one and cleans muddy track marks off the street.


12-4-18 (1)

Backing a load of steel beams onto the site (1 of 3 loads that day)


12-7-18 (1)

The biggest crane yet for this project - 110 tons - joins the 3 loads of steel beams. which will horizontally connect those standing beams on the left beginning in 3 days.


12-9-18 (2)

1. My Sunday walkaround: Closeup of the unextended crane and...

2. …a photostitch that includes the 3 beamloads, the crane and the to-be-connected vertical beams.


12-10-18 (4)

1. The fully-extended crane has just unloaded the 3 beamloads and placed them on the ground in neat piles.

2. The on-site side view

3,4. The first beam gets placed and the second one arrives.


Click to enlarge.



Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline Homer Jones

  • Long-time poster
  • *****
  • Posts: 622
  • Karma: 16
    • View Profile
Re: Tracking the 389 Main St rehab project
« Reply #64 on: December 13, 2018, 06:36:01 PM »
Ever give any thought to renaming this development  the “389 Main Street project “ rather than the “389 Main Street rehab project” since the word “rehab “ certainly does not apply to this new construction project .
Just a thought  in terms of accuracy.

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project
« Reply #65 on: December 13, 2018, 07:31:34 PM »
If I had to guess, I'd say it's because all of these projects are in the rehabilitation zone declared by the city in 2011 (see http://www.hackensacknow.org/index.php/topic,2008.0.html).

Perhaps the Editor can flesh that out.



Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project
« Reply #66 on: December 17, 2018, 03:00:16 PM »
12-11-18 (1-9)

This was fun, sitting in my living room and taking pictures of huge steel beams flying over the 389 Main St project - sometimes 3 at a time - courtesy of the massive 110-ton crane and then seeing the workers become beam-walkers. The fifth shot looks like a DWI test.


12-12-18 (10-20)

But what I really wanted to shoot was the flying beams from on-site and on the sun side, so I did that on this day right after shooting brick walls being knocked down just up the street at the Holman's/435 Main Site. It was like when I used to shoot heavy metal shows 30 years ago - lots of  noise, lots of "danger".

Every once in a while, I like to try to see if I still have my concert timing. I noticed (next-to-last shot) that the worker was catching something small thrown from below multiple times. In the last shot, I zoomed in and you can see exactly what it was.

Timing intact!


Click to enlarge most of the images.


Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project
« Reply #67 on: January 12, 2019, 02:00:13 PM »
It's been pretty slow lately, what with the holidays, the weather and who knows what else, so the scene hasn't changed a whole lot. I had expected to lose my river view by now, so I'm thankful for the extra time and river photo ops.


12-14-18 (2) Dumping gravel and sparking the beams

12-19-18 (2) Except for the Cats, these scenes haven't changed in almost a month.

12-23-18 (6) Last burst of activity in 2018 (I hope the building stands up better than its sign did.)

1-2-19 (first 4 pix) Starting the year right by closing Main St to dig up the road and install sewer pipe connectors. (5) Driving backwards around Main/Ward/State with a load of concrete Main St road pieces. (6) Dumping some gravel near the road pieces.

1-3-19 Uber for Cats

1-5-19 Raindrops on the wires

1-9-19 Blazing sunset hits the girders and the Noches de Colombia restaurant’s lights sit in the background shadows.

Click to enlarge.



Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project
« Reply #68 on: February 07, 2019, 05:35:10 PM »
Starting to get behind again (what else is new?).

These images run from January 15 to February 1. Dates are under each picture.

Click to enlarge (usually just the horizontals).




« Last Edit: February 07, 2019, 05:40:07 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project
« Reply #69 on: February 07, 2019, 06:36:11 PM »
These images run from February 2 to February 5 (busy days). Dates are under each picture.

This week seems to be dedicated to installing most of the corrugated metal floor decking, which had been started earlier on the Main St side of the first floor. After that, concrete will be poured into the decking to make the floors.The next post will have more decking installation images.

There are two photo stitches at the end from 2-3-19. One of them matches up well with one I took near the beginning of this thread before any buildings came down.

Click to make beeg.



« Last Edit: February 08, 2019, 02:43:08 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (2-6-19 to 2-17-19)
« Reply #70 on: March 11, 2019, 03:50:22 PM »
It's been over a month, so I have to split this into two posts.

2-6-19 (3)

These are all from February 6 - busy day. I put 3 photo stitches done that day together in the first image to illustrate how much of the corrugated metal floor decking was completed on that day. The next two images - also taken the same day - show how much work went into each section (and gave me a chance to capture the spark show).


2-8-19 (2)

Gotta include Homer's bucket, right?


2-9-19 (1)

The full site shot and the soon-to-disappear river


2-10-19 (2)


2-13-19 (1)

This shows what appears to be a custom snow shovel made to clear snow from the metal decking.


2-16-19 (2)


2-17-19 (2)

Includes a stitch from the Sunday walkaround (click to enlarge and then scroll to the right to see the whole thing. To shrink it back, use your back button).

Click to enlarge.


« Last Edit: March 11, 2019, 03:55:18 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (2-20-19 to 3-9-19)
« Reply #71 on: March 11, 2019, 04:02:04 PM »
Part 2

2-20-19 (1)

I'm sure all these snowy days didn't help the schedule.


2-21-19 (1)

When the snow melted, the water had to be blown off the metal decking.


2-23-19 (1)

This is a stitch taken from across Main St. After clicking, scroll to the right to see the whole thing.


2-25-19 (2)

The second shot is a video still. A blob of sparks rained down from above, hit concrete and practically bounced into some poor guy's face.


2-26-19 (3)

A wood delivery, a concrete block delivery and those blocks being put to immediate use.


2-28-19 (1)


3-1-19 (1)


3-2-19 (1)

This is the first time I noticed night lighting on the site.


3-4-19 (2)

Oh, goodie..............more snow


3-9-19 (1)

It wasn't that dark out - I just had to stop down the lens because that one section was just too brightly-reflective. It's kind of interesting-looking this way.


Click to enlarge.


« Last Edit: March 11, 2019, 04:09:02 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project (3-11-19 to 3-17-19)
« Reply #72 on: March 21, 2019, 08:12:34 PM »
3-11-19 (2) - In the parking garage (State St side) and trying to control a LOT of pages on the second floor on a windy day

3-13-19 (3) - Ward St side, first floor corrugated metal flooring in place, recently-installed sidewalk covering on Main St

3-15-19 (2) - New load of corrugated metal flooring for the third floor, putting that metal decking in place (Chicken Collision store in the background)

3-16-19 (2) - Sparkly river at low tide, the black market pastel snow shovel exchange

3-17-19 (5) - Third floor metal flooring almost done (second floor concrete soon), garage solitary confinement room (don't tell anyone), underside of third floor metal flooring, the metal corner of Main & Ward, yarn from after-work knitting class (REALLY don't tell anyone - the guys'll kill me!)


Click to enlarge.



« Last Edit: March 21, 2019, 08:20:55 PM by BLeafe »
Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project - the first floor floor-pour
« Reply #73 on: March 25, 2019, 04:45:39 PM »
Last Tuesday, March 19, 2019, they poured the concrete to create the first floor floor. I got a good tip to be there early AM.

The pictures are pretty much self-explanatory, except for the first 4 images.

The first one is a photo stitch taken from the roof behind the State Farm office, showing everything that was going on, including one of the many cement trucks needed for the entire floor, the big cement-pumper crane (center) and its hanging tube on the right over the newly-poured floor.

It turns out that this will probably be the last time for me on that roof because - as of today - they've already got the southern cement block wall up to the third floor, which also means no more shooting from the State Farm bathroom (thank you, Bob Testa - it was a big help).

I wasn't sure what was being made in the second and third shots, so I checked in with the site superintendent. His reply:

"It’s a footing for the extension of the existing wall inside basement area. A steel tube column will sit on top of that footing & be bolted down to carry a steel beam overhead. The beam overhead will connect to the piece of existing steel that’s there and the other end will be connected to the new steel tube column that will get installed."


Got that?

The fourth photo represents good photographic timing for me, but not for the poor guy who got pulled into the cement truck. I hope they put a plaque somewhere on the first floor to let people know who they're walking on and to do so respectfully.

(Just kidding, kids)

I also made a fun cement video that I'll post soon.


The pix (click to enlarge):



Like music? Like photography? Step into my office: http://xrl.us/BobL - - - - - - - http://xrl.us/BobsDarkness

Offline BLeafe

  • Global Moderator
  • *****
  • Posts: 4158
  • Karma: 26
    • View Profile
    • Bob Leafe Photography
Re: Tracking the 389 Main St rehab project - 1st floor cement-pour VIDEO
« Reply #74 on: March 26, 2019, 04:04:00 PM »
The video: