This post contains 15 images - 12 of whch are from the Current on River project. The other 3 are oh-by-the-way-the-Moore-Street-project-is-practically-next-door images, so let's do those first:
1-3. Not to sound dismissive or anything, but since I parked on Moore south of Salem, I had to walk north on Moore to get to Current on River and these 3 shots were readily available, so.....................
4. The reason I went to Current was because of this shot I took from home earlier that morning. Oh, no - were more floors being added? I needed to speak with someone there.
5. After my long hike of a whole block, crooked Current was in my sights (I could straighten it out a bit, but then I'd lose the top of the crane - it's bad either way).
6. A different, closer angle of what I had seen earlier from my living room
7-13. My usual clockwise shoot around the site. By the way, in #10, southbound traffic on River St is being stopped temporarily while a large vehicle utilizes the street to get from one part of the building to another. The is one of the reasons why there have been delays for the last few weeks for southbound traffic there.
14. Construction fever has spread across E. Berry St to the east entrance of the Giant Farmers Market, as seen in this 2-photo stitch. In the sequence of events, this should actually follow #8.
15. The last thing I usually do here is a 3-photo stitch of the SW corner of the site, standing on E. Camden St near the side of the library. The two gentlemen in the hard hats confirmed that what you see here is, indeed, the top floor of the building, so there should be no more loss of view from my apartment - at least from this project.
Click to enlarge: