3766
Hackensack Discussion / Re: Road Cave-in on Anderson St
« on: December 18, 2009, 11:43:10 AM »
I went over to the site yesterday to see how close they were to opening Anderson St. As you can see below, all the equipment is gone and the repaired areas are paved, albeit kind of unevenly.
I was guessing maybe a resurfacing/repaving would be needed today, but as I look out my window, I see a yellow center stripe has been painted on the street and a Parking Meter Control van is there.
Maybe they fixed the road up a bit since I was there yesterday...........I'll have to take a walk over there later and see.
.
I was guessing maybe a resurfacing/repaving would be needed today, but as I look out my window, I see a yellow center stripe has been painted on the street and a Parking Meter Control van is there.
Maybe they fixed the road up a bit since I was there yesterday...........I'll have to take a walk over there later and see.
.