149 Main (2)

Front and back


153 Main (7 - where the furniture store fire was)

All but the first picture were taken from the State St side.


157 Main (2 - The Battleground store)

Pix were taken from the front and back doors.


157A Main  (1 - Kids Rule store)


150-170 Main (6 - formerly known as The Hole)

Clockwise stitches (except for #4):

1 - from Main St

2 - from Mercer and Moore

3 - The project's storage lot between Moore and River streets - across River St, you can see piles of dirt where The Record used to be (two projects in one shot).

4 - Whatever these are...........they're OK.

5 - Southeast corner of the project

6 - South side of the project, plus the front of 149 Main


Click to enlarge.



12
Hackensack Discussion / Re: Arena Diner
« Last post by Editor on April 17, 2019, 01:19:09 PM »
14
Hackensack Discussion / Re: My favorite paper is not having a good day
« Last post by BLeafe on April 14, 2019, 01:39:57 PM »
Note: If anyone cares, the title of "Mr. MetsScribe" will NOT be taken over by Mr. JetsScribe. Apparently, that was only temporary until someone else was found. It looks like that person has been installed and will become Mr. MetsScribe2.

Onward and downward with Fives & Flubs.................

Click to enlarge.






15
Hackensack Discussion / Re: 2019 School Board Election
« Last post by Victor E Sasson on April 12, 2019, 05:59:06 PM »
16
4-6-19

1-7. The State St-side stairwell tower is finished and the scaffolding is torn down on Saturday.

8-10. Time for a quick walk-around:
- two views with one showing door openings for floors 3,4 and 5
- collected scaffolding waiting to get back into action in two days
- collected steel mesh waiting for the next cement floor pour
- STITCH  (with GLITCH) looking north (and the last time I get to sneak my building into the shot)


4-7-19

11. Day of rest.............to be cleaned up on Monday


4-8-19

12-15.  Cleanup, dryout, scaffolding back to work


4-9-19

16-20. The wood arrives (and some of it is pink!). Things will really be changing quickly now.


Click to enlarge.


17
4-3-19

1. That tower begins in the garage where I saw something that looked like an old fence until I saw it drive out of the site. This shows both images.

2-8. The visible part of that tower begins to take shape as lots of concrete blocks are brought in, as upward scaffolding is built.



4-4-19

9-15. As the tower rises, another crane is delivering steel beams to the Main St side. At one point, plane buzzes crane (maybe)............twice.


4-5-19

16,17. The Main St-side towers will soon start climbing higher and the State St-side stairwell tower nears completion


Click to enlarge.


19
1. Adios, Kates

2. Officer Squillace on the job

3. (top) The big cleanout.  (bottom) "You forgot something". (I had a feeling this would happen.............that's why I took the top shot)

4. EMERGENCY! No parking on the sidewalk!

5. As bingo fades away.............

6. Bed King (front)

7. Bed King (back)

8. From a distance, I thought this guy was a 389 Main project worker.

9. At the Second Reformed Church last Sunday

10. I see a potential pairing here.

11. This is my spare. I hope I don't get a flat because it'll stick out like a sore shiny thumb against my other wheels (it's too expensive to get them all done).

12. Yeah, I kinda expected that when the bell sounded, the lights flashed and the gates came down. BTW - you may recall that I posted a similar picture last July (http://www.hackensacknow.org/index.php/topic,3746). I just noticed that this is the exact same rail car and banner (probably). Both looked a lot better last year (so did New Jersey Transit).


Click to enlarge horizontals.



20
The remaining 20 photos (continued from the previous post)

Click to enlarge.